Current power usage
82.4 kW
−11.8% vs baseline
Electricity cost today
$286 AUD
$41 lower than expected
AI savings
$4,820 AUD
This month
Residents in comfort zone
94%
78 of 83 residents
Approvals required
Large or care-sensitive AI changes need a human decision before they are applied.
3 changes waiting for your approval
Small adjustments run automatically. Large or care-sensitive changes stop here first.Raise setpoints across South Wing by 3°C
20 rooms · 20 residents
24°C → 27°C for 90 minutes
Forecast demand 96 kW against a 90 kW network peak threshold at 15:00.
Multi-room change greater than 2°C — requires facility manager approval.
Reduce cooling in Clinical Area
Clinical Area · 4 residents
23.8°C → 25.5°C
Low occupancy detected and clinical rounds finished 20 minutes ago.
Care-sensitive zone — energy optimisation cannot proceed without care staff sign-off.
Close all west façade blinds to 100%
West Wing · 18 blinds
70% → 100% closed until 17:30
Extreme solar load forecast, outdoor peak 34°C at 15:00.
Full blackout of resident rooms — daylight amenity change needs approval.
AI Optimisation Now
Every decision balances resident care, comfort and electricity cost.
Room 203 switched to Eco Mode
Resident left the room 18 minutes ago (RTLS + wristband presence).
AC setpoint adjusted 24°C → 27°C
West Wing blinds closed to 70%
High afternoon solar load detected on west-facing façade.
12 motorised blinds moved to 70% closed
Dining Area pre-cooling
31 residents expected to arrive within 20 minutes (activity schedule + RTLS trend).
AC pre-cool started ahead of occupancy peak
Energy Consumption Today
Actual usage vs AI-adjusted baseline (kW)
Expected without AI
1,420 kWh
Actual
1,251 kWh
Energy saved
169 kWh
Cost saved
$48.20
Peak demand avoided
18.2 kW
Pre-cooling and blind staging shifted load away from the network peak window.
Alerts
Room 118 temperature outside comfort range
27.4°C — resident preference 23–25°C. Care requirement overrides energy optimisation.
RTLS device offline — Resident 024
Wristband battery at 8%. Location confidence degraded to Low.
Peak demand risk in 18 minutes
Forecast demand 96 kW vs 90 kW threshold. Pre-cooling and blind staging proposed.
Resident Intelligence
Wearable devices, RTLS presence and care requirements, combined.
Residents
83
In rooms
42
Dining / common areas
28
Outdoor / activities
9
Unknown / offline
4
North Wing
2224.6°C · 55% RH · Medium sunlight
South Wing
2025.1°C · 57% RH · High sunlight
Dining Room
2824.2°C · 60% RH · Low sunlight
Activity Room
624.9°C · 58% RH · Medium sunlight
Garden
331.0°C · 62% RH · High sunlight
Clinical Area
423.8°C · 52% RH · Low sunlight